Bob Leffler's RV-10
|
Date: 8-29-2009
|
Number of Hours: 2.00
|
Manual Reference: 34-4, 34-5
|
Brief Description: Baggage Door #3
|
|
34-4, Steps 2, 5, 6, 7, 8, & 9
Machine countersink the holes in the F-1060 Hinge for the heads of AN426AD3 rivets.
Rivet the F-1060 Hinge to the F-1059A Forward Frame. Rivet the F-1059A, B, and C Frames to the F-1059E Skin and to each other. Rivet the F-1059D Lock Bracket to the F-1059E Skin and to the F-1059B Upper Frame.
Install the Lock and the F-1062 Lock Latch. To prevent the screw from. backing out, apply Locktite to the threads.
Rivet the F-1059F Close-Out Panel to the F-1059A, B, and C Frames.
34-4 Completed per plans.
35-5, Steps 1, 2, 3, & 4
Final-Drill #40 the holes in the F-1058 Hinge Frame which are common to the F-1070-L Mid Side Skin. Dimple these holes.
Cleco the side flange of the F-1058 Hinge Frame to the F-1070-L Mid Side Skin. Cleco the top flange to the F-1034E Seatback Brace Gusset, the F-1034B Seatback Brace, and the F-1046-L Mid Fuse Longeron. Cleco the outboard hole in the bottom flange to the F-1022A-L Baggage Floor.
Match-Drill #30 the inboard hole in the bottom flange of the F-1058 Hinge Frame into the F-1022A-L Baggage Floor, cleco this hole, then final-drill #30 the outboard hole.
Final-Drill #30 the holes in all the parts common to the two holes in the top flange of the F-1058 Hinge bracket.
|
|
Exterior baggage door rivet
|
|
Insulation installed
|
|
Interior baggage door riveted
|
|
|
|
|
|
|
|
|