KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  8-26-2009
Number of Hours:  1.00
Manual Reference:  33-10
Brief Description:  Baggage area continued #5

33-10, Steps 5, 6, 7, 8, 9, 10, 12, & 12

Cleco together the F-1006E and F Baggage Bulkhead Corrugations. Center the F-6114B and C Wear Blocks on the shoulder harness cable notches in both sides of the F-1006E Baggage Bulkhead Corrugation.

Match-Drill #30 the 1/8" holes of the F-6114B and C Wear Blocks into the F-1006F and E Baggage Bulkhead Corrugations respectively. Separate the baggage bulkhead corrugations.

Match-Drill #40 the nutplate attachment rivet holes in the F-1006F Lower Baggage Bulkhead Corrugation.

Rivet the nutplates to both ends of the F-1006F Baggage Bulkhead Corrugation. Rivet the F-6114B Wear Block to the F-1006F Lower Baggage Bulkhead Corrugation using LP4-3 blind rivets. Install the rivets from the top of the wear block.

Rivet the F-6114C Wear Block to the F-1006E Upper Baggage Bulkhead Corrugation using LP4-3 blind rivets. Install the rivets from the front of the baggage bulkhead corrugation, and back up of the wear block with the washers shown.

33-10 Completed per plans.
' style=

Wear blocks riveted

Wear blocks riveted

' style=

Baggage bulkhead ready for installation

Baggage bulkhead ready for installation

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.