Bob Leffler's RV-10
|
Date: 7-21-2009
|
Number of Hours: 1.00
|
Manual Reference: 33-
|
Brief Description: Baggage floor stiffners & OSH
|
|
33-4, Step 1 & 2
I fabricated the twelve baggage floor stiffners today.
Separate the two F-1022 Baggage Floor Stiffeners into their component parts (F-1022B, C, D, E, F, and G) by removing the shaded areas depicted in the figure. I deburred all the parts.
I'll be heading to AirVenture, so there will be no updates for awhile.
If you are there, stop by RV-10 HQ at Camp Scholler. It's off 55th, south of Lindberg. I should be about the eigth site south of Lindbergh on the east side of 55th. There should be plenty of cold drinks and RV-10 talk at the campsite. There are almost 30 RV-10 builder camping together. In the evenings, there can be over 50+ RV-10 builders hanging out.
|
|
|
|
|
|
|
|
|