KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  7-10-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Adding an inpsection plate to the tunnel

Adding an inspection panel to the right side of the tunnel. I matched drilled all the holes on the doubler. I then drill positioning holes for the access plate and marked it's outline. I'll cut out the hole tomrrow.
' style=

Doubler all drilled

Doubler all drilled

' style=

Access plate mounted and cutout hole marked

Access plate mounted and cutout hole marked

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.