|
|
|
|
Bob Leffler's RV-10
|
Date: 5-16-2009
|
Number of Hours: 3.00
|
Manual Reference: 29-14, 29-16
|
Brief Description: Finish countersinking and start riveting fuselage
|
|
29-14, Steps 8 & 9
Disassemble all the parts used in this section from the understructure. Deburr the parts and the understructure.
Machine countersink all the #40 holes in the F-1015C-L and -R Middle Cabin Decks for the head of an AN426AD3 rivet. Machine countersink the holes that are common with the F-1069 Forward Side Skins in the F-1 013 Forward Fuselage Longerons, F-1046 Middle Fuselage Longerons, F-1004K Center Section Side Plates, F-1040 Upper Fuselage Channels, F-1041-L Lower Fuselage Channels and F-1042-L and -R Bulkhead Side Channels. Machine countersink the holes in the F-1005C-L and -R Bulkhead Side Channels that are common to the F-1070 Middle Side Skins.
29-14 Completed per plans
29-16, Steps 1, 2, 3, & 4
Modify the empennage bucking bar for use in the rest of this section. Fortunately, this modification was already done by Avery Tools.
Rivet the F-l0348 Seat Back Brace to the F-1034C-L and -R Fuselage Bulkheads. Rivet the seat back brace, F-1034E Seat Back Brace Gusset, F-1046-L Middle Fuselage Longeron and F-l 01028 Baggage Door Seal Angle together. Rivet the F-10102A Baggage Door Seal Angle to the middle fuselage Iongeron. Rivet the seat back brace and seat back brace gusset the F-1046-R Middle Fuselage Longeron together. Rivet the F-1046-L Middle Fuselage Longeron 10 the F-1005E-L Gusset. Rivet the F-1046-R Middle Fuselage Longeron to the F-1005E-R Gusset.
Cleco the F-1002 Forward Fuselage BUlkheads, F-1040 Upper Fuselage Channels, F-1041 Lower Fuselage Channels and F-1042E Gussets together and to the understructure.
|
|
Bulkhead side channels finished countersinking
|
|
Right side of the seat back and longeron
|
|
Left side of the seat back and longeron
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |