KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  12-2-2007
Number of Hours:  1.00
Manual Reference:  10-13, 10-14
Brief Description:  Continuing match drilling

10-13, Steps 5-7 Completed

10-14, Steps 1-4 Completed

Matched drilled the horizontal stabilizer attachment and the elevator stop to the aft deck on the empennage.

Matched drilled the shoulder harness anchors to the longeron

Drilled the static port hole to 1/2" and matched drilled the static port. to the skin.

Match drilled the cover plates.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.