Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
Elevator
10-7-2007
< Previous Log Entry
Next Log Entry >
Date:
10-7-2007
Number of Hours:
2.00
Manual Reference:
9-14
Brief Description:
Continued riveting
9-14, Steps 1-3
Just about done with these steps on both elevators. Brad assisted me with bucking a couple of the rivets that would have been very awkward doing them by myself.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
All
Ailerons
Avionics
Brakes
Cabin Cover
Control System
Diversions
Doors
Electrical
Elevator
Empennage
Engine
Final Assembly
Finish Kit
Firewall Forward
Flaps
Fuel System
Fuel Tanks
Fuselage
Horizontal Stab
Interior
Lighting
Milestones
Miscellaneous
Paint
Panel
Prep
Prop
Rudder
Shop
Tailcone
Tools
Vertical Stabilizer
Wing Leading Edge
Wings
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.