KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  9-5-2007
Number of Hours:  1.50
Manual Reference:  9-17, 9-18
Brief Description:  Continue elevator and trim match drilling - right

For the right elevator only

9-17, Steps 1, 3, 4

9-18, Steps 1-5

The replacement for the left trim tab should arrive tomorrow so I can complete the other side.
' style=

Trim tab arms after cutting

Trim tab arms after cutting

' style=

Right elevator and trim

Right elevator and trim

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.