Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
Miscellaneous
4-30-2012
< Previous Log Entry
Next Log Entry >
Date:
4-30-2012
Number of Hours:
2.00
Manual Reference:
Brief Description:
Vertical Stab Fairing and Battery Ground Terminal
The PPG sales rep stopped by the hangar tonight so I didn't get as much done as I liked.
Janice finished sanding the fairing on the vertical stab. I shot a coat of primer to see if it was done. It looks good. (Finally!!!!!)
Janice also helped me with the terminal for the ground cable. This is the last fat wire that needs to be terminated.
Vertical Stab Fairing
Battery Ground Terminal
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
All
Ailerons
Avionics
Brakes
Cabin Cover
Control System
Diversions
Doors
Electrical
Elevator
Empennage
Engine
Final Assembly
Finish Kit
Firewall Forward
Flaps
Fuel System
Fuel Tanks
Fuselage
Horizontal Stab
Interior
Lighting
Milestones
Miscellaneous
Paint
Panel
Prep
Prop
Rudder
Shop
Tailcone
Tools
Vertical Stabilizer
Wing Leading Edge
Wings
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.