Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
All
5-8-2012
< Previous Log Entry
Next Log Entry >
Date:
5-8-2012
Number of Hours:
3.00
Manual Reference:
Brief Description:
Fairings and more Fairings
Finished match drilling the empennage fairing and applied some micro to the small gaps around the horizontal stab.
Janice continued sanding the rudder and elevators. We applied another round of micro. Hopefully, this will be the last.
I sanded the micro that I applied to the cabin cover. It's ready for windows and fiberglass.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
All
Ailerons
Avionics
Brakes
Cabin Cover
Control System
Diversions
Doors
Electrical
Elevator
Empennage
Engine
Final Assembly
Finish Kit
Firewall Forward
Flaps
Fuel System
Fuel Tanks
Fuselage
Horizontal Stab
Interior
Lighting
Milestones
Miscellaneous
Paint
Panel
Prep
Prop
Rudder
Shop
Tailcone
Tools
Vertical Stabilizer
Wing Leading Edge
Wings
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.