KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
' style=
Date:  12-4-2019
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Continued wiring

Continued wiriing. Routed most of the wires that need to go through the spar carrythrough. Had to add a couple of additional holes and snap bushings. The Odyssey PC 680 arrived today and we installed it. Fabricated the battery wires to the master solenoid and to the main ground bolt at the firewall. The ground bolt goes through the firewall to the ground buss. All avionic ground go directly to the buss to avoid any ground loops.
' style=

Battery still needs boots

Battery still needs boots

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.