Finished fabricating the wire chase that goes from the fuel valve bracket to the forward sub-panel except for painting and final riveting. Installed nut plates in the bottom of the forward panel for attachinh the wire chase. Continued work on the rear wire routing.as well as tthe pitot and AOA pressure lines.