KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
' style=
Date:  6-28-2019
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Stabilizers and elevators

Disassembled the empenage and primed the small parts. Riveted the forward verticle stabilizer attachment to the forward spar. Drilled the rear verticle stabilizer to the rear fuselage bulkhead. Remounted the stabilizer and pinned the elevators. Assembled and primed the elevator pushrod and installed in the fuselage. Attached the pushrod to the elevators and verified elevator travel.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.