KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
' style=
Date:  11-21-2013
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Seats

Finished assembling the seat frames and slides. Disassembled, deburred and painted all the seat parts as well as the inspection panels for the floor and seat ramp.
' style=

Painted seat etc. parts

Painted seat etc. parts

' style=

The airframe makes a good drying rack!

The airframe makes a good drying rack!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.