Powered By Kitlog Pro v2.0
Phils Web Site
S-19
All
3-23-2014
< Previous Log Entry
Next Log Entry >
Date:
3-23-2014
Number of Hours:
3.50
Manual Reference:
Brief Description:
Left wing
Drilled holes in the left fuel tank and installed the fuel drain, vent, outlet fitting and fuel gauge sender. Went much faster than the first one!
Began installing the wing ribs on the left wing. They are being clecoed for now untill we prime the spar.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV9 Home
S-19 Home
Category
# Logs
# Hours
All
261
2070
Ailerons/Flaps
9
182
Avionics
20
122
Canopy
4
28
Empennage
22
230
Engine
4
40
Final assembly
28
83
Firewall forward
27
233
Fuel system
1
4
Fuselage center
30
215
Fuselage forward
27
222
Fuselage rear
14
121
Miscellaneous
16
105
Paint
14
87
Prop
2
8
Wings
43
390
Copyright © 2001-2024 Matronics. All Rights Reserved.