Powered By Kitlog Pro v2.0
Cheetah XLS Web Site
Cheetah XLS
All
11-30-2007
< Previous Log Entry
Next Log Entry >
Date:
11-30-2007
Number of Hours:
0.16
Manual Reference:
Page 064
Brief Description:
Front fork installation
The bolt is run through the front fork and gets attached to the rudder pedals. See how the bushing floats up and down. This is for the stearable nose wheel.
Note the bolt that runs through the bushing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cheetah XLS Home
Category
# Logs
# Hours
All
106
191
Avionics
3
33
Cockpit
15
38
Control linkages
14
14
Empennage
11
12
Engine
6
12
Fuselage
26
26
Landing Gear
9
7
Pre Assembly
5
12
Tools
1
Wings
16
37
Copyright © 2001-2024 Matronics. All Rights Reserved.