Brief Description: Drilling the Vertical Stabilizer
Removed outter blue protective vinyl stripes over holes using solderin iron from VS-801PP skin. Removed inner blue protective vinyl from VS-801PP skin.
Clecoed VS-801PP skin to empennage skeleton
Drilled & Match-drilled #40 all attaching holes from VS-801PP skin to skeleton. Marked drilled holes with green Sharpie.
Reduced little flange edge excess protuding out of skin and left it flush with VS-801PP skin's edge.
Marked location and orientation of VS-808PP spar doubler, VS-803PP spar, VS-410PP, VS-411PP, and VS-412PP hinge bracket pairs. Disassembled everything.
Skin clecoed on
Match drilling #40 skins to ribs
All holes match-drilled (both sides). Ready for disassembly