Brief Description: Installed bottom doubler and placed center spar
This is a multi-step process that places a bottom doubler under the undercarriage beneath the center spar. This is necessary because the rivet line for the front side of the center spar does not match with the previoius holes because of the extra spacers in the middle of the spar. In this way, the front rivet line has fresh metal to attach to.