Brief Description: 2 - Installed cabin heat control cable
Using #3 wedge Adel clamps, I routed the cabin heat control cable straight back from the panel and then followed the top of the L angles that stiffen the firewall. After cutting the sheath and control wire to length, I captured the wire in a swivel bolt mechanism as described on 9/5/11. This job was MUCH easier than it would have been with the canopy in place. This was a good move.