Powered By Kitlog Pro v2.0
RV-7 Construction Log
170B
All
11-10-2015
< Previous Log Entry
Next Log Entry >
Date:
11-10-2015
Number of Hours:
0.00
Manual Reference:
Brief Description:
Front Spar Carrythrough
The front spar carrythrough was inspected and found to be sound. Mountain Ariframe applied some epoxy primer to forestall possible future corrosion.
Rear Carrythrough
Front Carrythrough
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
170B Home
Category
# Logs
# Hours
All
82
7
Miscellaneous
1
7
None
81
RV-7 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.