KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  10-5-2012
Number of Hours:  1.20
Manual Reference:  p 7-6
Brief Description:  Right Tank and Leading Edge

Tonight I clecoed the baffle back to the tank and the tank back to the wing and started final reaming of the skin holes. I got all the way through the bottom sides of the leading edge and tank except for the tank skin to baffle holes on the inboard bay to avoid damaging the spar. I also got all the unclecoed holes on the bottom side before breaking for dinner (which was washed down with a Sierra Nevada Pale Ale, so no more work tonight).

No pictures tonight, as it still looks pretty much like photo 2 from yesterday.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.