KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  11-22-2016
Number of Hours:  1.95
Manual Reference:  p. 8-13, DWG 33
Brief Description:  Electric Flaps

Riveted the nutplates and shim to the F-767 (photo 1), then riveted that assembly to the F-766A channel, and installed the channel in the fuselage (photo 2).

Fit the flap motor to the F-766A channel and to the flap actuator. Clamped and match drilled the F-766B angle bracket to the channel. Deburred, prepped, and primed the angle and its faying surface on the channel.


Rivets Today: 7

Rivets Total: 12031
' style=

F-767 bracket riveted with shim and nutplates.

F-767 bracket riveted with shim and nutplates.

' style=

F-766 flap motor channel installed.

F-766 flap motor channel installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.