KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  3-20-2016
Number of Hours:  0.55
Manual Reference:  DWG 21
Brief Description:  Fabricated new F-710B

Fabricated a new F-710B out of a piece of 1x1x1/8 6061 T6 angle. I know it’s the right stuff, as it still had Vans' part sticker on it. ;o)

While I was at it I also noticed that I incorrectly fabricated the similar part on the F-711 bulkhead out of 1/16 thick angle instead of 1/8. Oh well, I guess the removal of THAT part is next...
' style=

Ready to drill.

Ready to drill.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.