KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  11-26-2014
Number of Hours:  2.10
Manual Reference:  p. 8-10
Brief Description:  Center and Aft Fuselage Riveting

Today I continued riveting the fuselage sides. I riveted the F-705 and the aft fuselage (baggage area) bulkheads on the right side, and from the F-706 back to the F-708 on both sides. I have a few rivets that need to be drilled out and replaced, but I'll wait until daytime when I have better light in the shop.

I have not yet riveted the longeron "keeper" rivets on the aft fuselage.

Rivets Today: 151
Rivets Total: 10750
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.