KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  12-28-2013
Number of Hours:  1.10
Manual Reference:  p. 8-6
Brief Description:  Center Fuselage

It's been several weeks since I've worked on the RV, but now that Christmas is over I'm ready to dive back in.

I spent most of this work session just figuring out where I was when I left off. It's time to add the F-704A front main bulkhead to the assembly. After a little debate with myself about what to use for spacers, I remembered that I'd borrowed a pair from a local RV-7 builder. I couldn't find them immediately, so I went out to the hangar and measured the thicknesses of the wing spar stubs.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.