KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  8-18-2018
Number of Hours:  2.40
Manual Reference:  
Brief Description:  Horizontal Stabilizer Repair

Drilled and deburred #40 pilot holes in aft flanges of the HS-00006 nose ribs. Marked centerlines on the remaining flanges HS-00005 and HS-00006 ribs, and on the inboard halves of the HS-702 spar channels. Clecoed HS-702 forward spar channels inside partially disassembled stabilizer. This was more difficult than I had anticipated, but I got it done. Clamped one side of one HS-00005 rib in place in preparation for drilling.
' style=

Aft flange of a nose rib ready to drill.

Aft flange of a nose rib ready to drill.

' style=

Front spar channels installed for fitting inboard ribs.

Front spar channels installed for fitting inboard ribs.

' style=

A nose rib in place for drilling.

A nose rib in place for drilling.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.