KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  3-13-2012
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Part 2 - Left Elevator Crack Repair

I was going to repair the crack in the elevator trailing edge (see entry on 3/4/12) with a doubler JB Welded inside the trailing edge, but I forgot to do this before riveting the skin to the skeleton. My thinking is that if I have to de-rivet the skin, I'll just replace it, so I just ground out the crack, cleaned out the primer, scuffed the inside surface with a small piece of maroon scotchbrite on a cotton swab, then injected a small amount of JB Weld. I taped over the trailing edge to hopefully get the JB Weld to form a radius. Before I applied the JB Weld, I went ahead and riveted the closeout tabs.

Rivets This Task: 2
Rivets Total: 2151
' style=

Removed the cracked area with my die grinder.

Removed the cracked area with my die grinder.

' style=

Tape used to (hopefully) get the JB Weld to form a radius at the trailing edge.

Tape used to (hopefully) get the JB Weld to form a radius at the trailing edge.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.