Installed one missing rivet through the lower left corner of the F-707 bulkhead where it goes through the lower J-stringer and aft side skin The hole was oversized so I used an NAS1097-4 rivet.
Replaced 18 “smeared” rivets that attach the F-714 aft deck to the longerons.
Rivets Today (net): 1 Rivets Total: 12177
One of the "smeared" rivets I replaced on the Aft Deck