KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  6-21-2021
Number of Hours:  1.00
Manual Reference:  SB 14-01-31
Brief Description:  SB-14-01-31

Completed SB 14-01-31 on the front spar on the horizontal stabilizer. I used an offset set (takes both hands for me) while RV-7 builder and flyer Gary Konrad bucked the hard-to-reach rivets on the “fingers” of the doublers, as well as the four rivets on each side common to the front spar and inboard nose and main ribs. All that’s left for the HS to be structurally complete (again…) are the rivets that attach the aft end of the main ribs to the aft spar, and all skin to inboard rib rivets.

Rivets Today: 24
Rivets Total: 12118
' style=

Hard to reach rivets (rib to spar) are DONE!

Hard to reach rivets (rib to spar) are DONE!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.