Spent way too much time trying to precisely locate the attach angles on the frame only to realize that the lateral spacing is all that’s necessary at this point; the vertical position doesn't matter for this step. Match drilled the C angles to the D angles and countersunk the holes for keeper rivets. Scuffed, cleaned, and primed all four angles in preparation for riveting.