KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  6-3-2021
Number of Hours:  2.50
Manual Reference:  Dwg 40
Brief Description:  Cabin Frame

Spent way too much time trying to precisely locate the attach angles on the frame only to realize that the lateral spacing is all that’s necessary at this point; the vertical position doesn't matter for this step. Match drilled the C angles to the D angles and countersunk the holes for keeper rivets. Scuffed, cleaned, and primed all four angles in preparation for riveting.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.