KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  10-17-2019
Number of Hours:  3.70
Manual Reference:  
Brief Description:  Aft Fuselage Repair

Due to already having to replace the F-710B angle once and having to upsize to -5 rivets, and the fact that one of those is a figure eight, I decided to replace the F-710 bulkhead. I fabricated a new F-710B HS attach angle but left it with a slight interference fit and will refine the fit after replacing the bulkhead. Removed rivets securing the F-710 bulkhead from the longerons down to the bottom J-stringer on both sides. The rest will require either working from under the fuselage or rolling the fuselage over.

Rivets Today: -26
Rivets Total: 11939
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.