Powered By Kitlog Pro v2.0
RV-7 Construction Log
RV-7
All
8-26-2019
< Previous Log Entry
Next Log Entry >
Date:
8-26-2019
Number of Hours:
1.00
Manual Reference:
Brief Description:
Aft Fuselage Repair
1.0 hrs
7A builder Bruce Stoddart came over to help drill out rivets in the F-710 bulkhead to replace the angle I misdrilled. He got about half way through and decided that he needed a center drill to continue.
Rivets Today: -5
Rivets Total: 11997
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
170B Home
RV-7 Home
Category
# Logs
# Hours
All
722
1903
Empennage
117
275
Fuselage
365
966
Miscellaneous
10
7
Replacement Parts
1
7
Shop
1
Tools
8
4
Wings
220
644
Copyright © 2001-2024 Matronics. All Rights Reserved.