KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  8-13-2019
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Cabin Frame

Laid out, drilled, and deburred #40 pilot holes in flanges if the aft two F-631A cabin frame channels.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.