KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  7-10-2016
Number of Hours:  4.45
Manual Reference:  p. 8-12
Brief Description:  Seat Backs, etc.

Today I prepped and primed the seat stiffener angles, along with some miscellaneous parts that have been waiting for several months for the pile to get large enough. I used my standard method of scotchbriting with liquid dish soap, rinsing, drying, and spraying with self-etching primer. Since I’ve moved to Michigan, I haven’t found my go-to brand Duplicolor, so I went with Rustoleum. I think it's pretty much the same stuff, and is a perfect color match.

After that I devinyled the seat pans where they meet the floor ribs and where the seat back hinges attach, then deburred all the holes. A friend and beer time arrived before I could prep and prime. :O)
' style=

Before

Before

' style=

After

After

' style=

Seat Pans

Seat Pans

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.