KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  5-10-2015
Number of Hours:  1.55
Manual Reference:  p. 8-10
Brief Description:  Forward Fuselage

Today I solo riveted the forward section of the left F-770 side skin to the F-717-L lower longeron, the F-713-L auxillary longeron, and the lower portion of the F-404 bulkhead between those longrons. I was tired and shold have quit before setting the seven AD470 rivets through the F-404, as I "smeared" every one of them at least a little bit. I'll have Hal help me with those on the right side...

Rivets Today: 53

Rivets Total: 11446
' style=

Forward section of side skin ready to rivet.

Forward section of side skin ready to rivet.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.