Today I continued adding structure to the forward fuselage. I started by re-clecoing the baggage and cabin floors in place to increast the torsional stiffness of the fuselage. I then clecoed in the F-902/F-7101 assemblies to the forward side skins and lower longerons. With these in place it seemed obvious that the F-902 bulkheads would have to be riveted to the lower longerons before clecoing the forward bottom skin in place (photo 1).
Rivets Today: 2 Rivets Total: 10344
The one rivet holding the F-902R bulkhead to the right lower longeron.