KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  11-2-2014
Number of Hours:  1.50
Manual Reference:  p. 8-10
Brief Description:  Forward Fuselage

Today I continued adding structure to the forward fuselage. I started by re-clecoing the baggage and cabin floors in place to increast the torsional stiffness of the fuselage. I then clecoed in the F-902/F-7101 assemblies to the forward side skins and lower longerons. With these in place it seemed obvious that the F-902 bulkheads would have to be riveted to the lower longerons before clecoing the forward bottom skin in place (photo 1).

Rivets Today: 2
Rivets Total: 10344
' style=

The one rivet holding the F-902R bulkhead to the right lower longeron.

The one rivet holding the F-902R bulkhead to the right lower longeron.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.