KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  7-6-2014
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Countersink Setups

Today I recorded the number of "clicks" (notches past that required for a flush rivet) required to nest various thicknesses of sheet dimpled with various die sets. This list should be adequate to countersink the main longerons.


#3 Rivet Only 0

0.025 Standard 4
0.025 Tank 7
0.025 Sub Struc. 11
0.032 Standard 7
0.032 Tank 11
0.032 Sub Struc. 14
0.040 Standard 11
0.040 Tank 14
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.