KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  5-21-2014
Number of Hours:  0.75
Manual Reference:  p. 8-9
Brief Description:  Forward Fuselage

Today I received from Brown Tool the first ever right angle drill I've ever owned (photo 1). I really like the Sioux palm drill I've had for 16 years, so I stuck with that brand. I don't think I'll be disappointed.

My first job with the new tool was match drilling the inboard forward floor stiffeners to the F-601J engine mount angles (photo 2).

I've been through the instructions several times, and I've convinced myself that drilling is complete and the fuselage is ready for disassembly (photo 3).
' style=

New Sioux right-angle drill.

New Sioux right-angle drill.

' style=

The last holes in this stage of building the fuselage are done.

The last holes in this stage of building the fuselage are done.

' style=

Ready for disassembly...

Ready for disassembly...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.