KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  1-5-2014
Number of Hours:  5.20
Manual Reference:  p. 8-6
Brief Description:  Center Fuselage

I spent the vast majority of today's work session edge deburring two remaining seat ribs, the baggage ribs, and the corner ribs. I also final drilled the baggage floors to the two inboard baggage rib nutplate rivet holes. The screw holes and all of the blind rivet holes were already final size, so I just deburred them. I also deburred the rivet holes in both bottom flanges of the F-404 bulkhead.

Just for a bit of a (badly needed) change of pace I broke out the crotch strap installation kit, and reinstalled the seat ribs to the F-404 bulkhead in preparation for drilling the crotch brackets to them. The pre-punched holes for the strap fitting bolts are for Vans belts, but I'm about 90% sure I'm going with Crow harnesses, so I'm going to call them and get some dimensions on their strap ends before I drill the brackets.
' style=

Vans crotch strap kit.

Vans crotch strap kit.

' style=

The front and rear brackets aligned and clamped for drilling the hole for the strap bracket bolt.

The front and rear brackets aligned and clamped for drilling the hole for the strap bracket bolt.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.