KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  5-11-2013
Number of Hours:  3.50
Manual Reference:  p 8-2
Brief Description:  Center Section Bulkhead, Firewall

Today I countersunk all the nutplate rivet holes in the bulkhead flanges and cover support ribs. I primed the bulkhead countersinks and installed the K1000-08 nutplates.

I then scuffed, cleaned, and primed the cover support ribs, stiffener angles, and control column mounts.

I finished up the day by assembling the firewall for the last time prepratory to riveting. My elbow hurt from all the cleaning and scrubbing of the bulkhead parts, so I called it a day at this point.

Rivets Today: 18
Rivets Total: 7338
' style=

Installed nutplates on bulkhead flanges.

Installed nutplates on bulkhead flanges.

' style=

Bulkhead parts scuffed, cleaned, and primed.

Bulkhead parts scuffed, cleaned, and primed.

' style=

Firewall reassembled and ready for riveting.

Firewall reassembled and ready for riveting.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.