Powered By Kitlog Pro v2.0
RV-7 Construction Log
RV-7
All
4-29-2013
< Previous Log Entry
Next Log Entry >
Date:
4-29-2013
Number of Hours:
0.30
Manual Reference:
Brief Description:
Left Wing Conduit Removal
Tonight I drilled out the pop rivets holding the brackets for the PVC conduit in the right wing, due to interference with the aileron push rod. I deburred all the holes after removing the rivets.
Rivtets Today: -20
Rivets Total: 7302
Removed conduit brackets and deburred holes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
170B Home
RV-7 Home
Category
# Logs
# Hours
All
722
1903
Empennage
117
275
Fuselage
365
966
Miscellaneous
10
7
Replacement Parts
1
7
Shop
1
Tools
8
4
Wings
220
644
Copyright © 2001-2024 Matronics. All Rights Reserved.