KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  10-8-2012
Number of Hours:  5.80
Manual Reference:  
Brief Description:  Right Fuel Tank

Today I got started on sealing the right tank. I riveted, filleted, and encapsulated rivets on the stiffeners. I then riveted and cleaned the drain fitting and filler flange, including the vent line clip. I found toward the end of sealing the left tank that the rivets are more flush if they are cleaned of sealant on the outside before riveting. I did all rivets today that way with excellent results.

Rivets Today: 94
Rivets Total: 4646
' style=

Stiffeners riveted, filleted, and rivets encapsulated.

Stiffeners riveted, filleted, and rivets encapsulated.

' style=

Drain fitting riveted and cleaned.

Drain fitting riveted and cleaned.

' style=

Filler flange riveted and cleaned.

Filler flange riveted and cleaned.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.