KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  10-6-2012
Number of Hours:  5.60
Manual Reference:  
Brief Description:  Right Tank and Leading Edge

Today I finished final reaming leading edge. I then match drilled the inboard z-brackets through baffle and rib flange holes (photo 1), removed the leading edge, and match drilled the outboard z-bracket. After removing the tank skin and interior ribs, I match drilled the interior z-brackets through the baffle holes.

I then partially reassembled the tank and match reamed tank rib aft flanges through the baffle (photo 2).

After disassembling the tank, I deburred the z-brackets, joint plate, tank and leading edge ribs, baffle, and interior of tank skin.

I also dimpled the tank ribs (photo 3). Lesson learned: Don't seal the BNC connector for the tank sender before dimpling the rib. It makes one hole a b***h to dimple...
' style=

Match drilling inboard z-bracket.

Match drilling inboard z-bracket.

' style=

Setup for match reaming aft flange of tank ribs through the baffle.

Setup for match reaming aft flange of tank ribs through the baffle.

' style=

Dimpling tank ribs.

Dimpling tank ribs.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.