KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  10-2-2012
Number of Hours:  2.20
Manual Reference:  p 7-5
Brief Description:  Right Fuel Tank

Temporarily attached and squared tank attach brackets to the spar and match drilled the top and bottom bolt holes through the spar. Removed the brackets and drilled nutplate holes in the outboard six brackets. (The inboard bracket's nutplates will be attached to the aft side of the spar).
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.