KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  8-18-2012
Number of Hours:  5.70
Manual Reference:  
Brief Description:  Left Leading Edge

The sealant on the inboard end rib on the left fuel tank needs another day to cure before riveting, so I went back to the leading edge.

First I removed the vinyl from the rib and spar rivet lines, top and bottom. I then deburred all holes in the skin and the ribs, and deburred skin edges. (I had deburred the rib edges before fluting). I prepped the skin rivet lines and the rib flanges by scuffing and cleaning, then primed them with Duplicolor self-etching primer.

I want to let the primer cure a bit before dimpling, so I started on the stall warning system. I'm still not convinced that I want to install the stall warner, but I have to install the hatch cover anyway, as the skin comes with the hatch already cut out. I'll go ahead and install the bracket now too, so I can install or not install the stall warner at my option later. I final reamed the hatch doubler and the bracket to the skin, and started deburring edges and holes.
' style=

Devinyled rivet lines.

Devinyled rivet lines.

' style=

Scuffed and primed interior rivet lines.

Scuffed and primed interior rivet lines.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.