KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  7-4-2012
Number of Hours:  3.30
Manual Reference:  OP-7, p 7-6
Brief Description:  Fuel Tanks

Drilled the T-813 capacitance plates to the #2 and #6 ribs for both tanks. Deburred holes and installed nutplates.

Notched eight 1/4" snap bushings to allow sender wires to pass through.

Located and drilled the vent line holes 7/16" for AN-833 bulkhead elbow fittngs on inboard ribs for both tanks. Also located and drilled BNC connector holes 3/8".

Before starting sealing, I still have to match drill and countersink the fill and drain fittings to the skin, then dimple/countersink the skin, ribs, and stiffeners.

Rivets Today: 24

Rivets Total: 2817
' style=

Capacitance plates drilled to ribs and nutplates attached.

Capacitance plates drilled to ribs and nutplates attached.

' style=

Vent and BNC connector holes drilled and deburred.

Vent and BNC connector holes drilled and deburred.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.