KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  10-29-2019
Number of Hours:  3.00
Manual Reference:  Section 2
Brief Description:  Heads, oil lines, and downtubes

Today was another great day at the airport. All 6 heads and oil lines are back on. I also added all new o-rings and a thin layer of "Right Stuff" to the down tubes. I noticed that they have been leaking so the o-ring simply wasn't creating a good enough seal. The Right Stuff will solidify but stay flexible to solve this issue once and for all.
Tomorrow I will be re-torquing the heads, installing the intake manifold, and draining the oil in prep for her first runup. This time I'm going to run Brad Penn breakin oil based on my shops recomendation. Let's see how she purs :)
' style=

Heads are on

Heads are on

' style=

Oil lines secured

Oil lines secured

' style=

Down tubes with Right Stuff

Down tubes with Right Stuff

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.