I had 3 hours to sneak into the shop today and get a few things finished up. It was a good day :) Here they are:
1. Re-wired the fuel pressure sensor 2. Re-wired the oil pressure sensor 3. Re-wired the oil temp sensor 4. plumbed the air box drain line 5. finished routing the AP roll servo wire 6. Made 2 new oil lines and installed them* 7. Made a small adjustment to the throttle linkage to avoid unwanted contact 8. Shop cleanup :)
* The new oil lines turned out ok, but they feel a bit tight in that, I need to make sure engine vibration and movement won't strain the hose and fittings too much. Monday I will finalize the cooler install and check for any issues. If nothing else, I'll just make a new set and call it good. Jury is out...