KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  3-24-2018
Number of Hours:  3.00
Manual Reference:  Section 2
Brief Description:  Finishing up

I had 3 hours to sneak into the shop today and get a few things finished up. It was a good day :) Here they are:

1. Re-wired the fuel pressure sensor
2. Re-wired the oil pressure sensor
3. Re-wired the oil temp sensor
4. plumbed the air box drain line
5. finished routing the AP roll servo wire
6. Made 2 new oil lines and installed them*
7. Made a small adjustment to the throttle linkage to avoid unwanted contact
8. Shop cleanup :)

* The new oil lines turned out ok, but they feel a bit tight in that, I need to make sure engine vibration and movement won't strain the hose and fittings too much. Monday I will finalize the cooler install and check for any issues. If nothing else, I'll just make a new set and call it good. Jury is out...
' style=

tidy up

tidy up

' style=

servo wired routed

servo wired routed

' style=

Oil Cooler lines are in

Oil Cooler lines are in

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.