KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  3-21-2018
Number of Hours:  5.00
Manual Reference:  Section 2
Brief Description:  All those details

I was fully expecting to start organising and running wires today, but I found I had other things to get done first. Like measuring distances for new oil and fuel lines, ordering them, installing a nipple on the air box, installing the oil cooler fittings, installing the oil temp and oil pressure sensors, installing the oil cooler vernatherm, and filter, and finally connecting the throttle cable :) I hate to mention it, but after getting a good birds eye view on the ladder I could tell I still had thrust angle issues with the engine mount. This meant pulling the bolts out and swapping a few washers around again. BUT, I am very happy with it's position now and will keep it where it is.
A nice ending to the day was a grand inspection from Izzy. Izzy approved!
' style=

drain nipple installed

drain nipple installed

' style=

oil cooler fittings installed

oil cooler fittings installed

' style=

Vernatherm, filter, temp and pressure sensors

Vernatherm, filter, temp and pressure sensors

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.